Loading…
WELL
MODULE
IPR + VLP
IPR PARAMETERS
METHOD & RESERVOIR
DARCY PARAMETERS
VLP PARAMETERS
FLUID & LIFT
TUBING / GEOMETRY
PARAMETER RANGES
IPR / VLP CHART
HISTORY MATCH — IPR / VLP TO PRODUCTION HISTORY
Period
Target err % ·
Tick Match IPR and/or Match VLP, choose a period, then Run Match. Uses this well's historical production (liquid rate, WC, Pr, BHP, WHP, GOR) over the selected window.
FIELDS
Field NameCountryBasinOperator FormationsPatternsWellsNominations
FORMATIONS
Active field only
FormationTypePr (init) φk (mD)h STOIIP / GIIPRFReserves
WELLS IN ACTIVE FIELD
Well NameTypeFormation Spud DateStartup Date TD (m)Initial Rate
PERIOD
AGGREGATION
FIELD PRODUCTION OVERVIEW
FIELD INJECTION RATE
NOMINATION — PLANNED vs ACTUAL
WELL EVENTS LOG
DATEWELLEVENT TYPESTATUSLIFTPr (bar)NOTES
PERIOD
AGGREGATION
FIELD PRODUCTION OVERVIEW
WELL STOCK
FIELD INJECTION RATE
RESERVOIR & WELLHEAD PRESSURE
WELL PRODUCTION PROFILE
PERIOD
AGGREGATION
Hold left-click & drag on chart to zoom in
WELL EVENT LOG
DATEEVENT TYPESTATUSLIFT METHODPrDOWNTIME (h)DEFERMENT (bbl)NOTES
PRODUCTION LOG
DATE OIL PLAN OIL WATER LIQUID GAS GOR WC% PLAN WC% PLAN BHP BHP WHP Res Pr ESP Hz NOTES
INJECTION PERFORMANCE
PATTERN
INJECTION vs PRODUCTION PROFILE
VOIDAGE REPLACEMENT RATIO (VRR)
VRR = Injected / Produced (reservoir bbl/d)  ·  Target ≥ 1.0
INJECTION & RESERVOIR PRESSURE
Avg injector BHP · Avg producer BHP / WHP · ΔP support
FRACTIONAL FLOW / TONGUE CURVE
HALL PLOT — INJECTION DIAGNOSTICS
SWEEP EFFICIENCY & DISPLACEMENT
F-Φ CURVE — LORENZ COEFFICIENT
INJECTOR WELLS & PATTERNS
INJECTORPATTERNPRODUCERS WI RATECUM INJ (Mbbls) AVG BHPVRR (30d) STATUS
FIELD MAP — BLOCK 47
100%
WELL REGISTRY
WELLCOORDINATESTDLIFT RESERVOIRPERFORATIONSSTATUSSHUT-IN DATE
METHOD
FIELD
FIELD DCA PARAMETERS
GLOBAL SETTINGS
WELL DCA PARAMETERS
Check wells to include. Edit qi, Di per well.
Well qi Di (1/yr) FC Start Hist (k m³)
FIELD PRODUCTION FORECAST — DCA
WELL STOCK FORECAST
ANNUAL PRODUCTION FORECAST
Year q avg (m³/d) Oil (k m³) Cum Oil (k m³) Active Wells Decline %/yr Recovery Factor
Reserves & Volumetrics
DETERMINISTIC INPUTS
DETERMINISTIC RESULTS
STOIIP = A·h·NTG·φ·(1−Sw)/Boi  ·  GIIP = A·h·NTG·φ·(1−Sw)/Bgi  ·  Reserves = HCIIP·RF
Monte-Carlo (probabilistic)
Per-variable low / mode / high. Distribution: triangular (low–mode–high), uniform (low–high), or normal (mode = mean, high−low ≈ ±2σ).
VariableLow (P90)ModeHigh (P10)Distribution
FDP Scenario Planner
Quick field-development profile → save → detail in MBAL
Step 1 · Development objects & reserves base
Each formation is a development object. Check the objects to build profiles for, and group those developed simultaneously (same group number). Reserves come from each object's saved Reserves calculation.
UseObject (formation)TypeSTOIIP/GIIPP90P50P10Sim. group
Select a saved FDP scenario to run its economics.
PERIOD
VIEW
NOMINATION HISTORY — PLANNED vs ACTUAL
Daily planned nomination vs actual field production delivery
NOMINATION LOG
DATE ↕ PLANNED ACTUAL DIFF FULFIL % NOTES
user
loading…